Professional liner replacement starts with accurate measurement and a written quotation, and continues through preparation, installation and refilling. Each installation is assessed for the pool, liner and site requirements.
Pricing & payment
Custom quotation — based on pool, liner and installation requirements
Liner cost — paid upfront
Remaining quoted balance — paid upon installation of the liner
The installation process
Measure the pool and obtain a liner quotation.
Provide a written quotation for the liner and installation.
Prepare the pool and remove the existing liner as required.
Inspect the exposed pool walls and floor.
Prepare suitable surfaces and address minor issues where appropriate.
Complete required additional structural or floor work before installing the new liner.
Install the liner, establish the appropriate vacuum and fit, and carefully begin filling.
Install applicable fittings and complete the work as the water reaches the required levels.
Before you book
Old-liner disposal, extensive floor reconstruction, structural repairs and concealed conditions may require additional charges. If removal reveals floor or structural conditions that make installation unsafe or unsuitable, corrective work must be completed before the new liner can be installed. Additional work will be explained and quoted.
Request measurement and quotation